Inside the Facility Behind Ally Labs
A facility is only as good as what it produces. Located in Evanston, Wyoming, we serve brands nationwide from 183,000 square feet built to take a formula from first sample to finished, shelf-ready product.
- 183,000 square feet
- cGMP compliant
- FDA-registered
- Evanston, Wyoming

The Facility
Formulation, manufacturing, filling, and packaging all happen under one roof, not across a patchwork of subcontractors. That matters when you're trying to hit a production timeline, since every stage of your product's development stays inside one accountable process.
The facility is cGMP compliant and FDA-registered, the same standard whether you're building a new formula from scratch or transferring an existing one from another manufacturer.
What Happens Here

Custom formulas move through a defined path before they reach production. Once a sample is developed, it completes a minimum 90-day stability period before approval. Additional testing or review may be required depending on the formula, packaging, claims, or other project requirements.
Once the formula is approved, required testing is addressed, materials and packaging are confirmed or on-site, and the project is production-ready, typical production lead time is approximately six to eight weeks. Actual timing varies by project and production scheduling.
minimum stability period before a custom formula is approved
typical production lead time once the formula, testing, materials, and packaging are confirmed and the project is production-ready
Visiting Our Facility
Facility visits aren't part of every project, but they happen. Audits, tours, and onboarding are common for larger projects and for brands going through Tech Transfer. Seeing the production line firsthand can matter as much as reviewing the paperwork.
Ready to Work With Us?
Want to see how this facility fits into your production plan? Talk to our team, and we'll walk through what happens next.
Talk to Our Team